Use Point System for Better Six Sigma Project Selection

 
 

By Drew Peregrim

One common problem many companies run into when starting Six Sigma and Lean efforts is what projects to choose. If they choose unwisely, the whole effort can be stalled or abandoned because the results may not be impressive enough to gain momentum for the cause. New practitioners should be wary of an initial project that solves a company crisis. The best strategy for most companies starting out is to focus on small projects with substantial monetary savings potential. Later, once the Six Sigma process has gained momentum, the emphasis should be shifted toward customer satisfaction projects. By selecting projects using a predetermined point system, practitioners can move forward with the projects that are most likely to help the Six Sigma effort in the long run.

Scaled-down Start

Project size should not be underemphasized, especially in the earlier projects. Large projects can tie up resources and have delayed results. The problem with starting off with a large-scale initial project is the amount of time required for optimization and data gathering is highly visible, while the payoff and the measurements of the payoff come later when the project is completed. By then, the Lean or Six Sigma effort may already be a well used target by its skeptics. This can cause a negative momentum, allowing the final favorable results to be buried under the stigma of the extra time and effort initially required to get the project right. It is also easy for people at an organization, especially those wanting to deflect blame for their part in a failure, to blame project failure on the new concept.

Maxwell Planck said, “A scientific truth does not triumph by convincing its opponents and making them see the light, but rather because its opponents eventually die and a new generation grows up that is familiar with it.” Starting a Six Sigma effort does not require its detractors to die, but it often requires that they be beaten down by overwhelming evidence of the methodology’s benefits.

Creating a Selection Method

One way to choose Six Sigma projects is by listing possible projects in a worksheet and rating them with an agreed-upon scale (Table 1). There should be a high emphasis on low time and high monetary improvement. The initial project selection criteria leads the initial efforts to pick the low-hanging fruit projects. This energizes the team and starts the process of racking up evidence of the benefits of Six Sigma. After the effort is established – when six to eight success stories are complete – the criteria can be adopted to best meet the company’s long-term goals.

Table 1: Sample Project Selection Worksheet
1. Project Name/DescriptionBenefits ScoreProject Rejection Criteria Score Totals 
 Customer desire  Is project currently in process?   
 Cost reduction  Is solution predetermined?   
 Quality improvement  Does the project have a forseeable end?  
 Time/size  Are project drivers or measurements known?  
 Technical requirements     
Totals   0 

The first step in project selection is to have a brainstorming meeting to come up with a list of possible projects. A good list size is 10 to 15 projects. The people who come up with the list may or may not be part of the Six Sigma team. In fact, it is better if those who come up with the list are those directly involved with the projects (supervisors and lead people) and can best describe the problem and scope of the project. The team leader should take a lower role in the project-list development, and should mainly suggest guidelines for doable projects.

After this list is established, the team must come together and rate each project using the criteria for initial projects (Table 2). It is best if this selection team is five people or fewer. Each member of the team is given a vote on the number to be assigned in each category with the average value of the team votes assigned to the selector. Using an average prevents arguments and moves the selection process along – trying to get the whole team to agree on a specific number is usually counterproductive and time consuming. A short discussion or debate before each vote on the project’s merits or shortcomings in each category is helpful in reminding each member of the criteria being considered. This selection team requires a strong moderator who can act independently and keep the group on track, usually the team leader. This process can require multiple meetings because Six Sigma and Lean are measurement based, and real numbers (or at least good estimates) are required to complete the chart.

Table 2: Initial Six Sigma Project Selection Scoring Criteria
Customer Desire Cost Reduction Quality Improvement Time/Size Technical Requirements Project Rejection Criteria 
Specific customer request = 4 Benefit greater than 10 x cost reduction/project cost = 5 Rejects reduced by more than 1 percent = 5 Small, less than 2 months = 10 Existing departmental personnel = 6 Is project currently in execution?
Yes = -10, No = 0  
Known customer benefit = 2Benefit between 5 x and 10 x cost reduction/project cost = 4 No significant reject reduction = 0 Medium, less than 6 months = 3 Existing specialized technical personnel (i.e., engineer, accountant, scientist) = 5 Is solution predetermined?
Yes = -20, No = 0 
No direct customer benefit = 0 Benefit between 2.5 x and 5 x cost reduction/project cost = 3  Very large, year-long time frame = 1 Six Sigma Green Belt = 4 Does the project have a forseeable end? Yes = 10, No = -50
 Benefit between 1 x and 2.5 x cost reduction/project cost = 2   Six Sigma Black Belt = 3 Are the project drivers or measurements known?
Yes = 8, No = -15
 Benefit less than 1 x cost reduction/project cost = 1  Specialized team = 2  
 No cost reduction anticipated = 0   Outside consultants = 1  

The list is put in order from highest score to lowest total score. The top projects should then be presented to the team. The best project to start with is often not the one on the top of the list, but one close to the top that has unique merits (it is an easy project or might have some special visibility with someone who could help the effort).

After the Six Sigma effort is established, the criteria can be adjusted to best match the company’s benefit as a whole. Table 3 shows an example of the adjusted criteria for selecting projects for a mature Six Sigma effort. There is now a higher customer emphasis in the selection process, which allows the established and experienced team to get more notoriety, and deal with the most important issues in the company. Also, larger projects are emphasized as the team and its reputation grows.

Table 3: Mature Six Sigma Project Selection Scoring Criteria
Customer Desire Cost Reduction Quality Improvement Time/Size Technical Requirements Project Rejection Criteria 
Specific customer request = 5 Benefit greater than 10 x cost reduction/project cost = 5Rejects reduced by more than 1 percent = 3 Small, less than 2 months = 3 Existing departmental personnel = 6 

Is project currently in execution?
Yes = -10, No = 0 

Known customer benefit = 3 Benefit between 5 x and 10 x cost reduction/project cost = 4 No significant reject reduction = 0 Medium, less than 6 months = 2 Existing specialized technical personnel (i.e., engineer, accountant, scientist) = 5 Is solution predetermined?
Yes = -20, No = 0
No direct customer benefit = 0 Benefit between 2.5 x and 5 x cost reduction/project cost = 3  Very large, year-long time frame = 1 Six Sigma Green Belt = 4 Does the project have a forseeable end?
Yes = 10, No = -20 
 Benefit between 1 x and 2.5 x cost reduction/project cost = 2  Six Sigma Black Belt = 3 Are the project drivers or measurements known?
Yes = 5, No = 0 
 Benefit less than 1 x cost reduction/project cost = 1   Specialized team = 2  
 No cost reduction anticipated = 0   Outside consultants = 1  

Small Beginnings

The ability to adapt the principles of Lean and Six Sigma to a specific company are the key to successful implementation and the achievement of the maximized values. Six Sigma and Lean require culture change, and the best approach is most often evolution, and not revolution.

About the Author: Drew Peregrim is a quality engineer with MTF, a foundation that prepares human tissue for transplant, and adjunct professor of engineering and management at Wilkes University. He has been involved in the Six Sigma, design for manufacturing and Lean manufacturing movements since 1995 and teaches these concepts in his bachelor’s and graduate degree courses. He has been a professor for eight years, a professional in management and engineering for more than 30 years, and an author and editor of textbooks. He has also published many articles on engineering in professional journals. Peregrim holds a master’s degree in materials science. He can be reached at drewwizard@aol.com.

 

Best Selling Products

  1. Certified Lean Six Sigma Green Belt Assessment Exam
    This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
  2. Certified Lean Six Sigma Black Belt Assessment Exam
    Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
  3. 5S Training Course
    One of the key fundamental tools of process improvement is 5S. 5S is a methodology for organizing and minimizing item...
  4. Six Sigma Black Belt (DMAIC) Training Slides
    The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
  5. Six Sigma DMAIC Training Slides
    The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
  6. Gage R&R Excel Template
    Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
  7. CSSBB Preparation Pack
    The CSSBB Preparation Pack includes materials for passing the Certified Six Sigma Black Belt (CSSBB) exam. This CSSBB Pr...

Premium Sponsor:

Accenture, Process & Improvement Performance, formerly George Group

Sponsors:

Achieve Operational Excellence: STAT-A-MATRIX

Advance your Military Career with Six Sigma Programs from Villanova University

MoreSteam: The Engine Room of Continuous Improvement

Novaces: Six Sigma for the Military

Sponsor iSixSigma Military



 

About iSixSigma Military

The purpose of this iSixSigma Military channel is to document the transformation of the United States Armed Services through the use of Lean Six Sigma and related process improvement methodologies.

Ronald E. Rezek, special assistant to the acting secretary of the Army, has said the goal of the Army's Lean Six Sigma deployment is to "make the business side of the Army as efficient as the war-fighting side is effective." Leaders of the other armed services echo that sentiment and transformation objective.

This portal will serve as a central community for everyone associated with the business transformation of the U.S. military. It will provide communication updates on deployments, the opportunity for military leaders at all levels to learn new skills, advance their careers and contribute to the success of their organizations.