Identifying High-Level Requirements Using SIPOC Diagram

 
 

By Debra Thomas, iSixSigma Contributing Writer

Often times it almost seems as if the people who run a business and the people developing and implementing the information technology (IT) systems for the business do not speak the same language. So it was with a project team that had developed a high-level, future-state process map for a renewal process in the insurance industry. The business people on the team needed to identify, document and convey the business needs to the IT group that was responsible for developing the automated workflow system for the new process.

The team, composed of business and IT people, discussed the high-level business needs, the kind of information needed by the IT group to develop the appropriate solution, and how best to gather and document those requirements. Several models/tools to gather requirements were described, which sounded very much like the information required in a SIPOC (suppliers, inputs, process, outputs, customers) diagram.

The SIPOC diagram is a tool that is typically used in the Define phase of a Six Sigma DMAIC project to identify process outputs and the customers receiving those outputs. Once the customers are identified, voice-of-the-customer data can be collected and customer requirements can be defined. The SIPOC diagram also helps scope the project, provides a high-level view of the workflow and helps ensure that all team members are seeing the project the same way.

SIPOC Helps Communications

It was apparent that by putting a bit of a twist to the standard SIPOC diagram, the business team could document the high-level business requirements in a language they understood, and also provide the high-level business requirement information needed by the IT group to begin work to develop and automate electronic workflow for the new process.

Figure 1 shows the high-level process map for the renewal process in this case study.

 Figure 1: Insurance Renewal High-Level, Future-State Process Map

A typical SIPOC diagram (Figure 2) was created for the high-level insurance renewal process. To define the high-level business requirements, the elements captured in a typical SIPOC diagram were placed as headings in each of five columns.

 Figure 2: SIPOC Diagram for High-Level Insurance Renewal

Each process step in the high-level process map was decomposed or broken down into a little more detail, although still high level. For example, Step 1: Initialize Renewal Process, in the high-level, future-state map was broken down into five more discrete activities, specifically:

  1. Initialize Renewal
  2. Review Accounts Renewing
  3. Formulate Renewal
  4. Review/Assign Account Executive
  5. Review/Assign Underwriter

These more detailed process steps were then listed from the first step to the last step in the column labeled "Process." In this example, only a small portion of the project (five activities) are presented and described. In the original study, there were a total of 39 activities listed under the five original high-level steps of the renew insurance coverage process.

The team identified and documented the suppliers, inputs, outputs and customers for the first activity, and then did the same for the next four activities, until all five activities in Step 1 were complete. Team members seemed to find it easier to first identify the items that were the outputs of the activity, followed by the customers of those outputs, then the inputs required by the activity, and finally the suppliers of each of the inputs.

Questions Asked to Complete SIPOC

The following questions were repeatedly asked by the team as it worked through each of the activity boxes in order to fill in the high-level business requirements:

  • Outputs: What information, data, report, eligibility status, etc., comes out of this activity or is produced as a result of this activity?
  • Customers: Who or what receives whatever it is that comes out of this activity?
  • Inputs: What data, supplies, system, tools, etc., are required for this activity, or who is needed to perform the action?
  • Suppliers: Who or what functional organization, system, report, database, etc., supplies or provides whatever it is that is needed as an input to this activity?

Table 1 shows the high-level business requirements that were defined for Step 1: Initialize Renewal Process. The team worked in a similar manner to identify the high-level business requirements for each of the 39 activities in all five of the original process steps. For this case study, various company specifics were coded and otherwise protected to ensure confidentiality.

Table 1: High-Level Business Requirements for Initialize Renewal Process

Suppliers

Inputs

Process

Outputs

Customers

(Identified
Fourth)

(Identified
Third)

 

(Identified
First)

(Identified
Second)

Step 1: Initialize Renewal Process
> Actuarial
> Reporting Database
> System A
> System D
> System E
> System F
> System F1
> System B
> Sales
> PRE
> TS
> Renewal/Anniversary Date
> Current Rates
> Current Plan Design
> Membership
> Census
> Claims Info
> Policy Type Codes
> Market Segment Indicator


Initialize
Renewal

> Entry into Workflow
> List of Monthly Renewals
> Non-Conformance Daily/Report
> Cycle Time Data/Report




> Underwriting
> PRE
> SRE
> Rating

Review
Accounts
Renewing

> List of Rated Renewals w/Initial Status
> Non-Conformance Daily/Report
> Cycle Time Data/Report
> Underwriting

> System A
> Data Repository
> System G
> System F1
> System C
> TS
> PRE
> SRE

> SRE Inputs
> System C
> Current Rates
> Prior Manuals
> Coverage
> Customer ID
> Medicare Primary Indicators GL
> Group ID
> Section ID
> Association Number
> Association Type
> Prior Effective Date
> Rate Effective Date
> Original Effective Date
> Plan IDs
> TEFRA Indicator
> Protected Class Indicator
> SIC Code
> Current Commission Amount
> Capitation (Historical/Prospective)
> Duration
> Experience Period

Formulate
Renewal

> Formula Renewal
> Non-Conformance Daily/Report
> Cycle Time Data/Report
> Underwriting
> System A> Manager Decision

Review/Assign
Account
Executive

> Updated Group/Acct. Executive
> Assigned Acct. Executive
> Non-Conformance Daily/Report
> Cycle Time Data/Report
> Marketing
> Sales
> Client Services
> System A

> Data Repository
> PRE
> Last Year's Underwriter Assignments
> Business Rules

Review/Assign
Underwriter

> Assigned Underwriter
> Updated List of Underwriter Assignments
> Non-Conformance Daily/Report
> Cycle Time Data/Report
> Underwriting

This was a win from both the business and the IT perspectives on the project. The business team identified the high-level business requirements in terms they understood, while at the same time, the information defined was what the IT team needed in order to do its development work. There were fewer problems from misunderstandings because the project team was working in a language that made sense to the business people and that met the needs of the IT people.

About the Author: Debra Thomas works for a major health insurer on implementation of an enterprise-wide process improvement initiative. She is a certified Master Black Belt and earned her Six Sigma Black Belt while working at Motorola. She has worked for Johnson & Johnson, Motorola, Tellabs and a homebuilding/construction company where she held roles in quality engineering/quality management, business quality, customer quality, strategic quality and Six Sigma initiatives. Ms. Thomas has used Six Sigma tools and methodologies in manufacturing, engineering, construction and transactional environments. She can be reached at dthomasjob@hotmail.com.

 

Best Selling Products

  1. Certified Lean Six Sigma Green Belt Assessment Exam
    This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
  2. Certified Lean Six Sigma Black Belt Assessment Exam
    Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
  3. 5S Training Course
    One of the key fundamental tools of process improvement is 5S. 5S is a methodology for organizing and minimizing item...
  4. Six Sigma Black Belt (DMAIC) Training Slides
    The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
  5. Six Sigma DMAIC Training Slides
    The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
  6. Gage R&R Excel Template
    Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
  7. CSSBB Preparation Pack
    The CSSBB Preparation Pack includes materials for passing the Certified Six Sigma Black Belt (CSSBB) exam. This CSSBB Pr...

Premium Sponsor:

Accenture, Process & Improvement Performance, formerly George Group

Sponsors:

Achieve Operational Excellence: STAT-A-MATRIX

Advance your Military Career with Six Sigma Programs from Villanova University

MoreSteam: The Engine Room of Continuous Improvement

Novaces: Six Sigma for the Military

Sponsor iSixSigma Military



 

About iSixSigma Military

The purpose of this iSixSigma Military channel is to document the transformation of the United States Armed Services through the use of Lean Six Sigma and related process improvement methodologies.

Ronald E. Rezek, special assistant to the acting secretary of the Army, has said the goal of the Army's Lean Six Sigma deployment is to "make the business side of the Army as efficient as the war-fighting side is effective." Leaders of the other armed services echo that sentiment and transformation objective.

This portal will serve as a central community for everyone associated with the business transformation of the U.S. military. It will provide communication updates on deployments, the opportunity for military leaders at all levels to learn new skills, advance their careers and contribute to the success of their organizations.