A Simple Model of a Variance Stable Process

 
 
By John J. Hickey

Most fairly accurate descriptions of equipment and/or process lifetimes assume that failure rates follow a three period I II III "bath tub curve pattern" where failures / errors:

I - Decrease during the debugging or improvement time period.

II - Remain relatively constant and at their lowest levels during the normal equipment or process operating period.

III- Increase during the wearout time period.

Scientific studies of limit based natural or complex growth patterns also suggest that many processes are inherently non linear and subject to chaotic tendencies. The Logistics Map(3) or Parabola Xt+1 = R Xt(1-Xt) where Xt+1 the measure of the next generation is a function of the present measure Xt, R is the growth factor and t is a discrete time variable is a simple model for these processes. When the growth factor R falls within the range of 1< R < 3 the process is stable. For R=2, the time series iterates Xt = X1 X2 X3… converge to the constant value Xc =.5 which can be easily demonstrated(see Table I) through the use of an Excel spreadsheet or pocket calculator:

Logistics Map

The critical growth factor value Rcr = 3.24(51/2 +1 ) in Table I signals the start of chaotic instability in this model process and for R = 3.8 the instability is clearly evident.

Process Variance Stability
If we assume that Variance Vt of a process during its lifetime varies between zero and some maximum acceptable value Vm, the application of the logistics parabola model to the process results in the iterate expression Vt+1=RVt(Vm-Vt). In this case the process is stable (1) within the growth factor R range of 1/Vm < R < 3/Vm . Also , the process attains super- stability or constancy when its variance equals one half of the maximum acceptable value( Vt =Vm/2) and when R = 2/Vm. This is illustrated for a process with a maximum allowed Variance of Vm= 9 (standard deviation =3) in Table II.

Super Stable Process Variance Map

The values of R in Table II are obtained by scaling the R values of Table I by 1/Vm=1/9. For example , R = 2/9= .222 is the super-stable growth factor and Rcr = 3.24/9 =.36 is the critical factor. In the case of Poisson distributed processes, the expected number of occurrences C =NP(large N , small fraction P of occurrence) is both the variance and mean of the distribution. A conditional Poisson process that conformed to this simple non linear model has the variance Ct+1= RCt(Cm -Ct) and would be stable in growth rate range 1/Cm < R < 3/Cm where Cm is the specified maximum number of occurrences. When Ct = Cm/2 and R = 2/Cm the process is super-stable(1) and ideally Poisson because the expected number of occurrences Co = C1= C2….= Ct =Ct+1 remain constant and are time independent over the operating lifetime of the process. This condition of super-stability is analogous to "States of Equilibrium" in Statistical Mechanics(2) and is illustrated by the Ct+1 = Ct intersecting line of above Figure I quadratic map.

The hypothetical model is suggestive of an ideal , super-stable six sigma process with an expected Poisson failure no of C = 1.7 PPM (N= 106 P=1.7x 10-6), maximum failure no. of Cm =3.4 PPM and growth factor that has the value R= .60.

A real world stable process would of course exhibit random fluctuations in variance which would not be strictly deterministic. However, as it ages or deteriorates and becomes unstable some deterministic chaos may be present and evident by an oscillatory pattern of variance(ex: machine tool wear). If a process is stable with a relatively constant variance and it meets requirements, in my opinion, it does not need to be fixed.

Notes and References

  1. |F'(Vt)| < 1 is the first derivative criteria for the stability of the fixed points Vt =0, Vt = Vm-1/R in the Variance quadratic map Vt+1 =R Vt (Vm-Vt). Since F'(Vt)= R(Vm-2Vt), the stability ranges for the fixed points Vt=0, Vt =Vm-1/R calculate as R < 1/Vm and 1/Vm < R < 3/Vm respectively. Vt =Vm/2 is the value of the non zero fixed point at the growth rate R = 2 /Vm and F'(Vt) =0 when this occurs. Therefore, a super-stable Poisson process Variance Ct would be "ideally Poisson" because its expected number of occurrences Ct = Ct+1…remain constant during successive time periods. The oscillatory behavior of the logistic parabola iterates in the unstable growth rate region R >= 3 is known as 2n period doubling. It is represented mathematically by the composite function expression Fn (X0)=X0 where n is the number of cycles or iterations required for a repetition of the point X0. The cycles or "splittings" increase as the associated growth rates R1 ..R2.. become larger. Chaos and infinite period doubling occurs with R > 3.6/Vm. For the 2-cycle period F2 (X0)=X0 and super-stable fixed point X0 =.5, the growth rate for Vm=1 is Rc = 51/2 +1.
  2. E.C. Andrews, Equilibrium Statistical Mechanics , John Wiley & Sons Inc., 1975 defines a state of equilibrium as one in which the information we have about the system it has reached a time -independent minimum. In the Chapter 7 section on ensembles with minimum information he proves that a maximum ignorance( lack of assigned causes) about the system exists when the state probabilities are equal.
  3. The technical literature on non linear dynamics, Logistic Equations, Quadratic Maps, Fixed Point Stability, Period Doubling and Chaos is quite extensive and only a Web site sampling is provided:
    * Non Linear Dynamics and Chaos
    * Interval Self Mappings
    * Logistic Maps

About The Author
John J. Hickey is a Chemist and Quality professional with extensive experience in the areas of Analytical Chemistry, QA, Safety, Regulatory Affairs, Management and Training.

 

Best Selling Products

  1. Certified Lean Six Sigma Black Belt Assessment Exam
    Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
  2. Six Sigma DMAIC Training Slides
    The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
  3. Certified Lean Six Sigma Green Belt Assessment Exam
    This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
  4. Process Management Training Slides
    The 2008 Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
  5. Gage R&R Excel Template
    Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
  6. Six Sigma Black Belt (DMAIC) Training Slides
    The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
  7. Certified Lean Six Sigma Black Belt E-book
    In 670 pages learn everything within the Lean Six Sigma DMAIC body of knowledge to successfully achieve Black Belt certi...

Premium Sponsor:

Accenture, Process & Improvement Performance, formerly George Group

Sponsors:

Achieve Operational Excellence: Oriel

Advance your Military Career with Six Sigma Programs from Villanova University

MoreSteam: The Engine Room of Continuous Improvement

Novaces: Six Sigma for the Military

Sponsor iSixSigma Military



 

About iSixSigma Military

The purpose of this iSixSigma Military channel is to document the transformation of the United States Armed Services through the use of Lean Six Sigma and related process improvement methodologies.

Ronald E. Rezek, special assistant to the acting secretary of the Army, has said the goal of the Army's Lean Six Sigma deployment is to "make the business side of the Army as efficient as the war-fighting side is effective." Leaders of the other armed services echo that sentiment and transformation objective.

This portal will serve as a central community for everyone associated with the business transformation of the U.S. military. It will provide communication updates on deployments, the opportunity for military leaders at all levels to learn new skills, advance their careers and contribute to the success of their organizations.